Main Projects Developed by OJSC Giprokauchuk official partner of WCS Energy for the Previous 10 years.

 

Nos.

Project Name

Client

Performed Works

 Work Execution Period

 1.

Middle Distillate Hydrotreatment Complex (MDHC). 
OSBL facilities including oil product stores and auxiliary production units. 
Technical support and engineering supervision of MDHC engineering design developed by 
«ABB Lummus Global».

 OJSC «Nizhnekamsk Refinery»

 Detailed Design

 1998/2002

 2.

Jet Fuel Unit.

 OJSC «Nizhnekamsk Refinery»

Engineering design and engineering survey works.
Detailed Design

 2003-2006

 3.

30 th. t/y capacity IIR production plant.

 OJSC«Nizhnekamskneftekhim»

Detailed Design

 2000-2002

 4.

IR & IIR production plants.
The 6-th system of polymerization & degassing.

OJSC«Nizhnekamskneftekhim»

 Detailed Design

2004

2007 

 5.

150 th. t/y total capacity Polystyrene production plant.
(1, 2 & 3 stages, 50 th. t/y each).

OJSC«Nizhnekamskneftekhim»

Geological engineering and geodetic engineering surveys.  
Detailed Design

2004

2005

2007-2008 

 6.

Butadiene production plant (DBO-2 section revamping).

 OJSC«Nizhnekanskneftekhim Divinyl»

Detailed documentation

 2008

 7.

120 th. t/y capacity Polypropylene production plant based on «DOW Chemical Co» (DOW/Union Carbide Corp.) process.

 «Stavrolen» LLC

 Construction Project revision. Detailed Documentation

 2004 - 2006

 8.

Provision of studies to organize ChIR production in order to develop the design basis for Basic Design of a pilot unit at «Togliattikauchuk» LLC. 

 OJSC «AK SIBUR»

 Feasibility study

 2005

 9.

Technical & Economic Assessment of various cases of «Tobolsk-Neftekhim»prospective development.
1-st Case.
2-nd Case.

  OJSC «AK SIBUR»

Feasibility study

 2005

 10.

Technical & Economic Assessment of Isoprene and Dicyclopentadiene production from C5 pyrolysis fraction at CJSC «Novokuibyishevsk Refinery».

  OJSC «AK SIBUR»

Feasibility study

 2006

 11.

Justification of Investments for «the Construction of 330 th. t/y capacity PVC Production Complex in Nizhegorodskaya region of RF».

   OJSC «AK SIBUR»

Feasibility study

 2007

 12.

Technical & Economic Assessment of Butadiene plant capacity uprating at«Tobolsk-Neftekhim» LLC. 

   OJSC «AK SIBUR»

Feasibility study

 2007

 13.

Development of proposals for the realization of Project «Organization of IR and IIR production» for «SIBUR» LLC in Tobolsk and Togliatti.

   OJSC «AK SIBUR»

Feasibility study. Proposals on construction site location

 2008

 14.

Central Gas Fractioning Unit capacity uprating up to 3 mln. t/y. «Tobolsk-Neftekhim» LLC.

   OJSC «AK SIBUR»

 Detailed Design

 2008

 15.

Construction Project (approvable part) and detailed documentation of residential building construction project. District No. 21 in Salekhard.

 OJSC « Lukoil-Neftegazstroy»

 Construction Project and Detailed Documentation

 2002

 16.

Construction of a facility for storage, transfer to export and provision of Krasnodar Region with liquefied hydrocarbon gases of 1 mln. t/y capacity in Shepsi settlement.

«Chernomorgazservice» LLC

Justification ofInvestments

 2001 - 2002

 17.

Extension of motor gasoline receipt and storage farms for  «Lukoil-Permnefteorgsyntez» LLC.

 «Lukoil-Permnefteorgsyntez»LLC

Detailed Design

 2004

 18.

Extension of crude oil receipt and storage farms for  «Lukoil-Permnefteorgsyntez» LLC.

 «Lukoil-Permnefteorgsyntez»LLC

 Topographic engineering & geological engineering surveys. Detailed Design

2004

 2004 

 19.

PENEX isomerization unit tie-ins to OSBL facilities and utility networks.

 «Lukoil-Permnefteorgsyntez»LLC

Project approvablepartDetailed Documentation

 2006

 20.

Reconstruction of site No. 1 of Oil Depot No. 3 for «Likoil-NVNP» LLC Astrakhan affiliate.

 «Lukoil-Nizhnevolzhsknefteproduct»LLC

 Feasibility Study (Project approvable part)

 2004

 21.

Oil and residual fuel oil transfer Complex in the territory of FGPU35 SR3 of the RF Ministry of Defense in Murmansk.

 «Tangra-Oil» LLC

 Detaileddocumentation.Detailed Design

 2004

 22.

Well construction and wellhead equipment installing and connection at «Yuzhnoe Khylchuyu» oil field 

 OJSC «PermNIPIneft»

Topographic engineering & geological engineering surveys

 2003 - 2005

 23.

 Complex gas safety project ofKokuisky oil field. Gas drying unit.

OJSC «PermNIPIneft»

 Detailed Design. Project approvable part

 2003 - 2004

 24.

Main pipelines.
Booster forcing pumps. Reconstruction and overhaul of main oil transfer pipelines.

 «ARKOR»

Project approvablepartDetaileddocumentation

 2004

 25.

Oil & Gas Treatment and processing Complex  of 1 mln. t/y capacity in terms of crude oil.

 «Usinsk Refinery» LLC

Project approvablepartDetaileddocumentation

 2007 - 2008

 26.

AGIDOL-110 production plant of 2 th. t/y capacity.

 OJSC «Sterlitamak Refinery»

Justification ofinvestments.Detailed Design

 2007

 27.

450 th. t/y capacity Methanol production plant based on «HALDOR TOPSOE» process. Methanol stores.

 OJSC «Shchekinoazot»

Project approvablepartDetaileddocumentation

 2007 - 2008

 28.

Process units of CJSC «Naftatrans»Refinery in Krasnodar Region.

 OJSC «VNIPIneft»

Project approvable part

 2008

 29.

Terminals of Material Supply Storage Area of «Naryanmarneftegaz» LLC on the Dresvyanka river. Nenets Autonomous District.

 
«Naryanmarneftegaz» LLC

 Geological engineering & geodetic engineering surveys

 2008

 30.

Aromatics Production Complex withinthe Complex of Petrochemical & Oil Refining plants at OJSC «Taneko».

 OJSC «VNIPIneft»

 Project approvable part

 2008

 31.

Catalytic Cracking Complex.Combined unit of hydrogen production with a unit of start-up steam production. OJSC «Lukoil-Nizhegorognefteorgsyntez».

 CJSC «Neftekhimproject».

St.-Petersburg

 Detailed documentation

 2008

 32.

Refinery.
Construction organization project.

 CJSC «Naftatrans»

 Feasibility Study (Project approvable part)

 2008

 33.

Coordination of oil transfer pipeline between «Yuzhnoe Khulchuyu» fieldOil Gathering Central Station and«Varandey» distribution point.

 OJSC «Globalstroy-Engineering»

 Geodetic engineering surveys

 2008

 34.

Package unit for production of Novolac resins and Pulverbakelite.

 OJSC «Karbolit»
Orekhovo-Zuevo, Moscow region

Detailed documentation

 2008

 35.

Construction site for 500 th. t/y Propylene and Polypropylene production plants and for the associated OSBL facilities.

 «Tobolsk-Polymer» LLC

Geodetic-engineeringsurveys

 2008

 36.

 
Catalytic Cracking Complex. CatalyticCracking UnitTechnical Solutions

 «Luloil-Nizhegorodnefteorgsyntez»LLC

Detaileddocumentation

 2008




Office in Russia
Group of companies BIURS
Street Reshetnikova
House 17, Korpus 4A
Saint Petersburg (196105)
Russian federation

Office in UAE
Group of companies BIURS
WCS General Trading FZC
P.O.BOX 487446
Dubai, UAE
 

Любое полное или частичное воспроизведение материалов сайта возможно только при наличии активной гиперссылки на источник: www.wcsenergy.ru

Все права защищены © 2009 WCS

создано в студии: