Nos. | Project Name | Client | Performed Works | Work Execution Period |
1. | Middle Distillate Hydrotreatment Complex (MDHC). OSBL facilities including oil product stores and auxiliary production units. Technical support and engineering supervision of MDHC engineering design developed by «ABB Lummus Global». | OJSC «Nizhnekamsk Refinery» | Detailed Design | 1998/2002 |
2. | Jet Fuel Unit. | OJSC «Nizhnekamsk Refinery» | Engineering design and engineering survey works. Detailed Design | 2003-2006 |
3. | 30 th. t/y capacity IIR production plant. | OJSC«Nizhnekamskneftekhim» | Detailed Design | 2000-2002 |
4. | IR & IIR production plants. The 6-th system of polymerization & degassing. | OJSC«Nizhnekamskneftekhim» | Detailed Design | 2004 2007 |
5. | 150 th. t/y total capacity Polystyrene production plant. (1, 2 & 3 stages, 50 th. t/y each). | OJSC«Nizhnekamskneftekhim» | Geological engineering and geodetic engineering surveys. Detailed Design | 2004 2005 2007-2008 |
6. | Butadiene production plant (DBO-2 section revamping). | OJSC«Nizhnekanskneftekhim Divinyl» | Detailed documentation | 2008 |
7. | 120 th. t/y capacity Polypropylene production plant based on «DOW Chemical Co» (DOW/Union Carbide Corp.) process. | «Stavrolen» LLC | Construction Project revision. Detailed Documentation | 2004 - 2006 |
8. | Provision of studies to organize ChIR production in order to develop the design basis for Basic Design of a pilot unit at «Togliattikauchuk» LLC. | OJSC «AK SIBUR» | Feasibility study | 2005 |
9. | Technical & Economic Assessment of various cases of «Tobolsk-Neftekhim»prospective development. 1-st Case. 2-nd Case. | OJSC «AK SIBUR» | Feasibility study | 2005 |
10. | Technical & Economic Assessment of Isoprene and Dicyclopentadiene production from C5 pyrolysis fraction at CJSC «Novokuibyishevsk Refinery». | OJSC «AK SIBUR» | Feasibility study | 2006 |
11. | Justification of Investments for «the Construction of 330 th. t/y capacity PVC Production Complex in Nizhegorodskaya region of RF». | OJSC «AK SIBUR» | Feasibility study | 2007 |
12. | Technical & Economic Assessment of Butadiene plant capacity uprating at«Tobolsk-Neftekhim» LLC. | OJSC «AK SIBUR» | Feasibility study | 2007 |
13. | Development of proposals for the realization of Project «Organization of IR and IIR production» for «SIBUR» LLC in Tobolsk and Togliatti. | OJSC «AK SIBUR» | Feasibility study. Proposals on construction site location
| 2008 |
14. | Central Gas Fractioning Unit capacity uprating up to 3 mln. t/y. «Tobolsk-Neftekhim» LLC. | OJSC «AK SIBUR» | Detailed Design | 2008 |
15. | Construction Project (approvable part) and detailed documentation of residential building construction project. District No. 21 in Salekhard. | OJSC « Lukoil-Neftegazstroy» | Construction Project and Detailed Documentation | 2002 |
16. | Construction of a facility for storage, transfer to export and provision of Krasnodar Region with liquefied hydrocarbon gases of 1 mln. t/y capacity in Shepsi settlement. | «Chernomorgazservice» LLC | Justification ofInvestments | 2001 - 2002 |
17. | Extension of motor gasoline receipt and storage farms for «Lukoil-Permnefteorgsyntez» LLC. | «Lukoil-Permnefteorgsyntez»LLC | Detailed Design | 2004 |
18. | Extension of crude oil receipt and storage farms for «Lukoil-Permnefteorgsyntez» LLC. | «Lukoil-Permnefteorgsyntez»LLC | Topographic engineering & geological engineering surveys. Detailed Design | 2004 2004 |
19. | PENEX isomerization unit tie-ins to OSBL facilities and utility networks. | «Lukoil-Permnefteorgsyntez»LLC | Project approvablepart. Detailed Documentation | 2006 |
20. | Reconstruction of site No. 1 of Oil Depot No. 3 for «Likoil-NVNP» LLC Astrakhan affiliate. | «Lukoil-Nizhnevolzhsknefteproduct»LLC | Feasibility Study (Project approvable part) | 2004 |
21. | Oil and residual fuel oil transfer Complex in the territory of FGPU35 SR3 of the RF Ministry of Defense in Murmansk. | «Tangra-Oil» LLC | Detaileddocumentation.Detailed Design | 2004 |
22. | Well construction and wellhead equipment installing and connection at «Yuzhnoe Khylchuyu» oil field | OJSC «PermNIPIneft» | Topographic engineering & geological engineering surveys | 2003 - 2005 |
23. | Complex gas safety project ofKokuisky oil field. Gas drying unit. | OJSC «PermNIPIneft» | Detailed Design. Project approvable part | 2003 - 2004 |
24. | Main pipelines. Booster forcing pumps. Reconstruction and overhaul of main oil transfer pipelines. | «ARKOR» | Project approvablepart. Detaileddocumentation | 2004 |
25. | Oil & Gas Treatment and processing Complex of 1 mln. t/y capacity in terms of crude oil. | «Usinsk Refinery» LLC | Project approvablepart. Detaileddocumentation | 2007 - 2008 |
26. | AGIDOL-110 production plant of 2 th. t/y capacity. | OJSC «Sterlitamak Refinery» | Justification ofinvestments.Detailed Design | 2007 |
27. | 450 th. t/y capacity Methanol production plant based on «HALDOR TOPSOE» process. Methanol stores. | OJSC «Shchekinoazot» | Project approvablepart. Detaileddocumentation | 2007 - 2008 |
28. | Process units of CJSC «Naftatrans»Refinery in Krasnodar Region. | OJSC «VNIPIneft» | Project approvable part | 2008 |
29. | Terminals of Material Supply Storage Area of «Naryanmarneftegaz» LLC on the Dresvyanka river. Nenets Autonomous District. | «Naryanmarneftegaz» LLC | Geological engineering & geodetic engineering surveys | 2008 |
30. | Aromatics Production Complex withinthe Complex of Petrochemical & Oil Refining plants at OJSC «Taneko». | OJSC «VNIPIneft» | Project approvable part | 2008 |
31. | Catalytic Cracking Complex.Combined unit of hydrogen production with a unit of start-up steam production. OJSC «Lukoil-Nizhegorognefteorgsyntez». | CJSC «Neftekhimproject». St.-Petersburg | Detailed documentation | 2008 |
32. | Refinery. Construction organization project. | CJSC «Naftatrans» | Feasibility Study (Project approvable part) | 2008 |
33. | Coordination of oil transfer pipeline between «Yuzhnoe Khulchuyu» fieldOil Gathering Central Station and«Varandey» distribution point. | OJSC «Globalstroy-Engineering» | Geodetic engineering surveys | 2008 |
34. | Package unit for production of Novolac resins and Pulverbakelite. | OJSC «Karbolit». Orekhovo-Zuevo, Moscow region | Detailed documentation | 2008 |
35. | Construction site for 500 th. t/y Propylene and Polypropylene production plants and for the associated OSBL facilities. | «Tobolsk-Polymer» LLC | Geodetic-engineeringsurveys | 2008 |
36. | Catalytic Cracking Complex. CatalyticCracking Unit. Technical Solutions. | «Luloil-Nizhegorodnefteorgsyntez»LLC | Detaileddocumentation | 2008 |